Sunday 10 April 2016

For those interested in technical details, a surprising detail of german maritime installation. The hot and cold water system includes distribution blocks of plastic. The copper connectors which take the hoses can only be screwed in once or twice and then the trouble starts. We hope for a more traditional solution tomorrow. Details to follow.



Left hand distribution block (plastic!) drips.
 

No comments:

Post a Comment